Project Summary

 

  • Owner :
  • The Pirbright Institute
  • Location :
  • Pirbright
  • Duration :
  • 36 Weeks
  • Services :
  • Mechanical And Electrical
  • Value :
  • £4.75m
Project Information

 

The new CL2 Containment Facility at the Pirbright Institute where LJJ were responsible for the M&E installation on a design and build basis including the medical gases and special laboratory ventilation.

 

As well as the stand alone ventilation systems for the cryogenic storage rooms there were independent ventilation systems for each of the micro biological safety cabinets.

 

The whole site is served by its own HV infrastructure and the project required the HV ring to be extended with the addition of four HV transformers and associated switchgear.

 

Other cross site services to be upgraded included the installation of a 500m gas main, new water infrastructure and extension of the data cabling infrastructure.


Northern Office (Head Office)

107 Bowesfield Lane
Stockton-on-Tees
Teesside
North Yorkshire
TS18 3HF
Tel : +44 (0) 1642 617517
Fax : +44 (0) 1642 617534
Email : info@ljjcontractors.co.uk

Central Office

Unit 2 Elm Court
Meriden Business Park
Copse Drive
Coventry
CV5 9RG
Tel : +44 (0) 121 7701699
Fax : +44 (0) 121 7882198
Email : info@ljjcontractors.co.uk

Southern Office

Dowding House
Wellington Road
Cressex Business Park
High Wycombe
Bucks, HP12 3PS
Tel : +44 (0) 1494 472323
Fax : +44 (0) 1494 530002
Email : info@ljjcontractors.co.uk